loginMember login help      
Rates in indonesia   IT industry  Information Expo  Pump market   Skills
 Latest Demand  Info
·
·
·
·
·
·
·
·
·
·
 Latest Supply  Info
·
·
·
·
·
·
·
·
·
·
 suggestions and comments
 Title:
Content:
E_mail:
 
Your current position:Home > Industrial Express > Pump market
Dagang Oilfield hydraulic pump to resume producti
Pump market

release time: 2006-12-30 10:24:23     scanning times: 775

      November 19, Dagang oilfield geological technical staff after three plants were analyzed. 22 downhole hydraulic pump to restore production to date, 20.3 tons of oil a day eventually good results.
      22 wells located in the western belt Date Date hole near Block 55 wells. 1983 liquid and 333 tons of oil a day in the middle of pack, and then plugging that has no value. Pump the second Test in 1997, the Japanese oil production reached 15 tonnes. However, due to thick oil pump unit can not operate normally, it was forced to stop operation. Recently, the technical staff to re-date geological potential and the development of the 22 wells on further studies to determine that wells resume production.
      Dates successful return to production of 22 wells, adding a bright spot not only for producing measures, Well potentials for the future with a long stopped thinking

source of news: Internet   announcer ChinessPumpSupplier

  
  Related information  
 
 
 
 
 
 
  Commentary  
UserName:
PassWord:
Content:
    
 
About us |Contact us |Privacy statement |Copyright | Advertising Services |
Advertising License: Get network name: A Web site:ChinesePumpSupplier
License:ICP06021220
Service Line: 0717-6909885 6909886 6730753