November 19, Dagang oilfield geological technical staff after three plants were analyzed. 22 downhole hydraulic pump to restore production to date, 20.3 tons of oil a day eventually good results. 22 wells located in the western belt Date Date hole near Block 55 wells. 1983 liquid and 333 tons of oil a day in the middle of pack, and then plugging that has no value. Pump the second Test in 1997, the Japanese oil production reached 15 tonnes. However, due to thick oil pump unit can not operate normally, it was forced to stop operation. Recently, the technical staff to re-date geological potential and the development of the 22 wells on further studies to determine that wells resume production. Dates successful return to production of 22 wells, adding a bright spot not only for producing measures, Well potentials for the future with a long stopped thinking